Language
Home > Aircraft Parts > Pratt & Whitney
PW2000 Engine
PW2000 Engine

PW2000 Engine

Brand:Pratt & Whitney Model:PW2000 Engine

Pratt & Whitney's PW2000 engine covers the mid-thrust range from 37,000 pounds to 43,000 pounds.
The PW2000 powers all models of the twin-engine Boeing 757, and is the exclusive power as the F117 for the four-engine C-17 Globemaster III military transport. The PW2040 model also powers the U.S. Air Force’s C-32A, the military version of the 757.
The PW2000 engine entered revenue service in 1984 as the first commercial engine with FADEC (Full-Authority Digital Electronic Control) technology. Pratt & Whitney introduced an improved version of the PW2000, the Reduced Temperature Configuration (RTC) in 1994. This enhanced model offers improved reliability and durability for long on-wing times and reduced total maintenance cost, along with excellent environmental performance.
The PW2000 is approved for 180-minute Extended-range Twin-engine Operations (ETOPS) and meets all current and proposed noise and missions regulations worldwide.
Tags:

Pratt & Whitney's PW2000 engine covers the mid-thrust range from 37,000 pounds to 43,000 pounds.

The PW2000 powers all models of the twin-engine Boeing 757, and is the exclusive power as the F117 for the four-engine C-17 Globemaster III military transport. The PW2040 model also powers the U.S. Air Force’s C-32A, the military version of the 757.

The PW2000 engine entered revenue service in 1984 as the first commercial engine with FADEC (Full-Authority Digital Electronic Control) technology. Pratt & Whitney introduced an improved version of the PW2000, the Reduced Temperature Configuration (RTC) in 1994. This enhanced model offers improved reliability and durability for long on-wing times and reduced total maintenance cost, along with excellent environmental performance.

The PW2000 is approved for 180-minute Extended-range Twin-engine Operations (ETOPS) and meets all current and proposed noise and missions regulations worldwide.

Specs (7)

Fan Tip Diameter

78.5 In

Length, Flange To Flange

141.4 In

Takeoff Thrust

38,400–43,734 Lb

Flat Rated Temperature

87°F

Bypass Ratio

6.0

Overall Pressure Ratio(Takeoff)

27.6–31.2

Fan Pressure Ratio

1.74

Frequently Asked Questions

  • What is the typical lead time for gas turbine overhaul services?
    The lead time for gas turbine overhaul services ranges from 6 to 14 weeks, depending on the damage assessment, parts availability, and whether hot-section repairs are required. Expedited options may reduce this by 30%.
  • Do you provide customizations for legacy turbine control systems?

    Yes, we retrofit legacy systems (e.g., GE Frame 5, Siemens V94.2) with modern digital controllers, typically completing hardware integration within 4-8 weeks. Software migration requires additional validation time.

  • How often should industrial gas turbines undergo performance testing?

    We recommend annual performance testing under ISO 3977-2 standards. Critical applications (e.g., offshore platforms) may require semi-annual tests with emissions compliance checks.

  • Are your radiation-hardened (rad-hard) semiconductors compliant with MIL-PRF-38535?

    All rad-hard devices (e.g., FPGA, ADC) are QML Class V certified under MIL-PRF-38535 and tested to MIL-STD-883 Method 1019 for SEU tolerance. Full qualification reports are available upon request.

  • What temperature ranges do your military-grade ICs support?

    Our ASICs and power management ICs operate across -55°C to +175°C ambient temperatures, with derating curves provided in military temperature range (MTR) datasheets.

  • Are PMA parts interchangeable with OEM components?

    Our PMA parts (e.g., actuators, sensors) hold FAA/EASA Form 1 certification and match OEM form/fit/function. Installation requires SB/MB documentation per FAA AC 23.1529.

  • What traceability standards do you follow for aircraft fasteners?

    All NAS/MS fasteners include full DNA traceability: melt source (AMS 2301), heat/lot numbers, and AS9100-compliant MTRs with ultrasonic test reports.

  • How do you handle urgent AOG (Aircraft on Ground) requests?

    AOG orders ship within 4 hours for stocked items (FAA-PMA, EASA Part 21G). Non-stock critical parts trigger priority manufacturing with 72-hour max turnaround.

Recommended Products