High efficiency and availability, with low total cost in power generation and mechanical drive Benefits 37.5% efficiency in mechanical drive; up to 84% thermal efficiency in combined heat and power Flexible operation to 50% of rated speed; ideal in mechanical drive—can start with fully pressurized compressor Lower maintenance costs and 35,000 hours MTBM—automapping eliminates seasonal DLN tuning and intermediate boroscopic inspections Features Rugged, high-performance axial flow compressor Single-row annular combustion system for best-in-class low emissions and wide fuel flexibility Highest efficiency over the entire power range thanks to variable-geometry low-pressure turbine nozzles technology Applications Onshore and offshore Pipeline, gas storage Industrial, and combined heat and power Overview The NovaLT™16 gas turbine draws on our latest innovations combined with the best proven technologies and fleet experience from our entire gas turbine portfolio.
Yes, we retrofit legacy systems (e.g., GE Frame 5, Siemens V94.2) with modern digital controllers, typically completing hardware integration within 4-8 weeks. Software migration requires additional validation time.
We recommend annual performance testing under ISO 3977-2 standards. Critical applications (e.g., offshore platforms) may require semi-annual tests with emissions compliance checks.
All rad-hard devices (e.g., FPGA, ADC) are QML Class V certified under MIL-PRF-38535 and tested to MIL-STD-883 Method 1019 for SEU tolerance. Full qualification reports are available upon request.
Our ASICs and power management ICs operate across -55°C to +175°C ambient temperatures, with derating curves provided in military temperature range (MTR) datasheets.
Our PMA parts (e.g., actuators, sensors) hold FAA/EASA Form 1 certification and match OEM form/fit/function. Installation requires SB/MB documentation per FAA AC 23.1529.
All NAS/MS fasteners include full DNA traceability: melt source (AMS 2301), heat/lot numbers, and AS9100-compliant MTRs with ultrasonic test reports.
AOG orders ship within 4 hours for stocked items (FAA-PMA, EASA Part 21G). Non-stock critical parts trigger priority manufacturing with 72-hour max turnaround.