Geonyx™ family is designed for three main applications: navigation, target geolocation and artillery pointing. Capable of operating under extreme conditions and in a full GNSS denied environments, Geonyx™ is highly reliable.
Pointing accuracy < 0.5 mils thanks to HRG Crystal™ technology
Quick & flexible alignment in GNSS denied environment
The most compact, robust & reliable inertial navigation system on the market and hard-mounted
Geonyx™ pointing accuracy is first-of-class under the harshest conditions and offers the market’s shortest alignment time in any configuration (with or without hybridization).
Geonyx™ is the most compact INS for its class of performance and can be mounted on any orientation on vehicles, turrets and artillery weapons.
Thanks to HRG Crystal™ technology, Geonyx™ is totally unaffected by vibrations and shocks of artillery guns, giving it a virtually unlimited and maintenance-free lifespan.
Yes, we retrofit legacy systems (e.g., GE Frame 5, Siemens V94.2) with modern digital controllers, typically completing hardware integration within 4-8 weeks. Software migration requires additional validation time.
We recommend annual performance testing under ISO 3977-2 standards. Critical applications (e.g., offshore platforms) may require semi-annual tests with emissions compliance checks.
All rad-hard devices (e.g., FPGA, ADC) are QML Class V certified under MIL-PRF-38535 and tested to MIL-STD-883 Method 1019 for SEU tolerance. Full qualification reports are available upon request.
Our ASICs and power management ICs operate across -55°C to +175°C ambient temperatures, with derating curves provided in military temperature range (MTR) datasheets.
Our PMA parts (e.g., actuators, sensors) hold FAA/EASA Form 1 certification and match OEM form/fit/function. Installation requires SB/MB documentation per FAA AC 23.1529.
All NAS/MS fasteners include full DNA traceability: melt source (AMS 2301), heat/lot numbers, and AS9100-compliant MTRs with ultrasonic test reports.
AOG orders ship within 4 hours for stocked items (FAA-PMA, EASA Part 21G). Non-stock critical parts trigger priority manufacturing with 72-hour max turnaround.