Language
Home > Aircraft Parts > SAFRAN
Geonyx Land true
Geonyx Land true

Geonyx Land true

Brand:SAFRAN Model:Geonyx Land true

Geonyx™ family is designed for three main applications: navigation, target geolocation and artillery pointing. Capable of operating under extreme conditions and in a full GNSS denied environments, Geonyx™ is highly reliable.

Geonyx™ family is designed for three main applications: navigation, target geolocation and artillery pointing. Capable of operating under extreme conditions and in a full GNSS denied environments, Geonyx™ is highly reliable.

Pointing accuracy < 0.5 mils thanks to HRG Crystal™ technology

Quick & flexible alignment in GNSS denied environment

The most compact, robust & reliable inertial navigation system on the market and hard-mounted

Operational efficiency


Geonyx™ pointing accuracy is first-of-class under the harshest conditions and offers the market’s shortest alignment time in any configuration (with or without hybridization).

Flexible systems integration


Geonyx™ is the most compact INS for its class of performance and can be mounted on any orientation on vehicles, turrets and artillery weapons.

Robustness and reliability


Thanks to HRG Crystal™ technology, Geonyx™ is totally unaffected by vibrations and shocks of artillery guns, giving it a virtually unlimited and maintenance-free lifespan.

Tailored to meet every needs


Frequently Asked Questions

  • What is the typical lead time for gas turbine overhaul services?
    The lead time for gas turbine overhaul services ranges from 6 to 14 weeks, depending on the damage assessment, parts availability, and whether hot-section repairs are required. Expedited options may reduce this by 30%.
  • Do you provide customizations for legacy turbine control systems?

    Yes, we retrofit legacy systems (e.g., GE Frame 5, Siemens V94.2) with modern digital controllers, typically completing hardware integration within 4-8 weeks. Software migration requires additional validation time.

  • How often should industrial gas turbines undergo performance testing?

    We recommend annual performance testing under ISO 3977-2 standards. Critical applications (e.g., offshore platforms) may require semi-annual tests with emissions compliance checks.

  • Are your radiation-hardened (rad-hard) semiconductors compliant with MIL-PRF-38535?

    All rad-hard devices (e.g., FPGA, ADC) are QML Class V certified under MIL-PRF-38535 and tested to MIL-STD-883 Method 1019 for SEU tolerance. Full qualification reports are available upon request.

  • What temperature ranges do your military-grade ICs support?

    Our ASICs and power management ICs operate across -55°C to +175°C ambient temperatures, with derating curves provided in military temperature range (MTR) datasheets.

  • Are PMA parts interchangeable with OEM components?

    Our PMA parts (e.g., actuators, sensors) hold FAA/EASA Form 1 certification and match OEM form/fit/function. Installation requires SB/MB documentation per FAA AC 23.1529.

  • What traceability standards do you follow for aircraft fasteners?

    All NAS/MS fasteners include full DNA traceability: melt source (AMS 2301), heat/lot numbers, and AS9100-compliant MTRs with ultrasonic test reports.

  • How do you handle urgent AOG (Aircraft on Ground) requests?

    AOG orders ship within 4 hours for stocked items (FAA-PMA, EASA Part 21G). Non-stock critical parts trigger priority manufacturing with 72-hour max turnaround.

Recommended Products