Versatile, Epsilon™ family provides advanced applications, even in GNSS denied environment: navigation (position & heading), aiming aid, driving aid. It covers all tactical applications from logistic to Infantry fighting vehicles, as well as main battle tank.
Can be integrated with small artillery caliber to provide precision pointing
Connectable to any Battle Management Systems
An inertial navigation unit immune to magnetic disturbances
Thanks to their advanced resonator gyros, Epsilon™ One et Epsilon™ 10 systems provide advanced ins navigation capabilities without being GNSS dependent. Epsilon family integration into vehicles is easier than legacy systems based on magnetic sensors.
Versatile, Epsilon™ family integrates with all land platforms, from artillery to logistics. Its Epsilon™ One et Epsilon™ 10 units cover navigation, aiming and driving needs by guaranteeing optimal performance:
Yes, we retrofit legacy systems (e.g., GE Frame 5, Siemens V94.2) with modern digital controllers, typically completing hardware integration within 4-8 weeks. Software migration requires additional validation time.
We recommend annual performance testing under ISO 3977-2 standards. Critical applications (e.g., offshore platforms) may require semi-annual tests with emissions compliance checks.
All rad-hard devices (e.g., FPGA, ADC) are QML Class V certified under MIL-PRF-38535 and tested to MIL-STD-883 Method 1019 for SEU tolerance. Full qualification reports are available upon request.
Our ASICs and power management ICs operate across -55°C to +175°C ambient temperatures, with derating curves provided in military temperature range (MTR) datasheets.
Our PMA parts (e.g., actuators, sensors) hold FAA/EASA Form 1 certification and match OEM form/fit/function. Installation requires SB/MB documentation per FAA AC 23.1529.
All NAS/MS fasteners include full DNA traceability: melt source (AMS 2301), heat/lot numbers, and AS9100-compliant MTRs with ultrasonic test reports.
AOG orders ship within 4 hours for stocked items (FAA-PMA, EASA Part 21G). Non-stock critical parts trigger priority manufacturing with 72-hour max turnaround.