Leading overall electrical efficiency performance in the same category
Mature technology brings higher efficiency and performance
Based on mature aerodynamic design, the SGT-A05 gas turbine is a flexible, compact, and lightweight design that is highly suitable for providing efficient and fast start-up capabilities in distributed power generation.
The power output of SGT-A05 gas turbine ranges from 4 to 6 megawatts and can be used for applications such as base load, combined power generation, cogeneration, mobile power, and emergency power.
SGT-A05 has been proven to operate in various challenging conditions and locations around the world, including desert regions in the North Sea, West Africa, Siberia, Brazil, Alaska, Southeast Asia, and the Middle East. The SGT-A05 engine has passed the seismic certification of Mil-S-901C, making it particularly suitable for areas with frequent or severe seismic activity.
Yes, we retrofit legacy systems (e.g., GE Frame 5, Siemens V94.2) with modern digital controllers, typically completing hardware integration within 4-8 weeks. Software migration requires additional validation time.
We recommend annual performance testing under ISO 3977-2 standards. Critical applications (e.g., offshore platforms) may require semi-annual tests with emissions compliance checks.
All rad-hard devices (e.g., FPGA, ADC) are QML Class V certified under MIL-PRF-38535 and tested to MIL-STD-883 Method 1019 for SEU tolerance. Full qualification reports are available upon request.
Our ASICs and power management ICs operate across -55°C to +175°C ambient temperatures, with derating curves provided in military temperature range (MTR) datasheets.
Our PMA parts (e.g., actuators, sensors) hold FAA/EASA Form 1 certification and match OEM form/fit/function. Installation requires SB/MB documentation per FAA AC 23.1529.
All NAS/MS fasteners include full DNA traceability: melt source (AMS 2301), heat/lot numbers, and AS9100-compliant MTRs with ultrasonic test reports.
AOG orders ship within 4 hours for stocked items (FAA-PMA, EASA Part 21G). Non-stock critical parts trigger priority manufacturing with 72-hour max turnaround.