The SGT-600 combines ruggedness with excellent maintenance procedures, achieving high availability and low operating costs.
The high reliability, excellent fuel flexibility, and third-generation DLE make the SGT-600 the perfect choice for industrial combined heat and power (CHP) and combined cycle power plants (CCPP), onshore oil and gas power generation, and mechanical drive applications.
High fuel flexibility
The SGT-600 provides first-class fuel flexibility, allowing for high levels of inert gases, hydrogen, and heavy hydrocarbons.
-Ethane 100%
-Propane 100%
-Butane and heavy alkanes 15
-Hydrogen up to 60%
-Nitrogen 40
- H₂S ≤ 3.5%
Third generation DLE system
The SGT-600 adopts the third-generation dual fuel dry low emission (DLE) combustion system.
-NO ₓ emission level<9 vppm
-CO emission level<20 vppm
-Reduce the load by 50%
-The same DLE system is used for dual fuel and liquid operations
-The NO ₓ emissions from liquid fuels are less than 58 ppmvd
-CO emissions from liquid fuels<25 ppmvd
-Reduce load by 50% on liquid fuel
-Dual fuel DLE function, with fuel conversion capability (gas to liquid fuel and liquid fuel to gas), can convert fuel under load
Yes, we retrofit legacy systems (e.g., GE Frame 5, Siemens V94.2) with modern digital controllers, typically completing hardware integration within 4-8 weeks. Software migration requires additional validation time.
We recommend annual performance testing under ISO 3977-2 standards. Critical applications (e.g., offshore platforms) may require semi-annual tests with emissions compliance checks.
All rad-hard devices (e.g., FPGA, ADC) are QML Class V certified under MIL-PRF-38535 and tested to MIL-STD-883 Method 1019 for SEU tolerance. Full qualification reports are available upon request.
Our ASICs and power management ICs operate across -55°C to +175°C ambient temperatures, with derating curves provided in military temperature range (MTR) datasheets.
Our PMA parts (e.g., actuators, sensors) hold FAA/EASA Form 1 certification and match OEM form/fit/function. Installation requires SB/MB documentation per FAA AC 23.1529.
All NAS/MS fasteners include full DNA traceability: melt source (AMS 2301), heat/lot numbers, and AS9100-compliant MTRs with ultrasonic test reports.
AOG orders ship within 4 hours for stocked items (FAA-PMA, EASA Part 21G). Non-stock critical parts trigger priority manufacturing with 72-hour max turnaround.