Language
Home > Military Semiconductors > LYNRED-USA
LYNRED-USA EOLE MW
LYNRED-USA EOLE MW

LYNRED-USA EOLE MW

Brand:LYNRED-USA Model:LYNRED-USA EOLE MW

The EOLE™ product has been optimized for detecting Methane as well as other gases, including Methanol, Benzene and Ethanol. Methane is the second contributor to the greenhouse effect after CO2. EOLE is suitable for portable and 24/7 applications.

EOLE's performance exceeds the requirements of new European regulations because EOLE can detect up to 10x times less than regulation.

The EOLE product is integrated into the new platform PlugUp developed by LYNRED, which gives integrators the opportunity of creating a single design that can host different products to cover a range of multi-purpose applications; for example changing the Galatea MW SL and EOLE product is thus facilitated thanks to identical interfaces.

The EOLE™ product has been optimized for detecting Methane as well as other gases, including Methanol, Benzene and Ethanol. Methane is the second contributor to the greenhouse effect after CO2. EOLE is suitable for portable and 24/7 applications.

EOLE's performance exceeds the requirements of new European regulations because EOLE can detect up to 10x times less than regulation.

The EOLE product is integrated into the new platform PlugUp developed by LYNRED, which gives integrators the opportunity of creating a single design that can host different products to cover a range of multi-purpose applications; for example changing the Galatea MW SL and EOLE product is thus facilitated thanks to identical interfaces.

Frequently Asked Questions

  • What is the typical lead time for gas turbine overhaul services?
    The lead time for gas turbine overhaul services ranges from 6 to 14 weeks, depending on the damage assessment, parts availability, and whether hot-section repairs are required. Expedited options may reduce this by 30%.
  • Do you provide customizations for legacy turbine control systems?

    Yes, we retrofit legacy systems (e.g., GE Frame 5, Siemens V94.2) with modern digital controllers, typically completing hardware integration within 4-8 weeks. Software migration requires additional validation time.

  • How often should industrial gas turbines undergo performance testing?

    We recommend annual performance testing under ISO 3977-2 standards. Critical applications (e.g., offshore platforms) may require semi-annual tests with emissions compliance checks.

  • Are your radiation-hardened (rad-hard) semiconductors compliant with MIL-PRF-38535?

    All rad-hard devices (e.g., FPGA, ADC) are QML Class V certified under MIL-PRF-38535 and tested to MIL-STD-883 Method 1019 for SEU tolerance. Full qualification reports are available upon request.

  • What temperature ranges do your military-grade ICs support?

    Our ASICs and power management ICs operate across -55°C to +175°C ambient temperatures, with derating curves provided in military temperature range (MTR) datasheets.

  • Are PMA parts interchangeable with OEM components?

    Our PMA parts (e.g., actuators, sensors) hold FAA/EASA Form 1 certification and match OEM form/fit/function. Installation requires SB/MB documentation per FAA AC 23.1529.

  • What traceability standards do you follow for aircraft fasteners?

    All NAS/MS fasteners include full DNA traceability: melt source (AMS 2301), heat/lot numbers, and AS9100-compliant MTRs with ultrasonic test reports.

  • How do you handle urgent AOG (Aircraft on Ground) requests?

    AOG orders ship within 4 hours for stocked items (FAA-PMA, EASA Part 21G). Non-stock critical parts trigger priority manufacturing with 72-hour max turnaround.

Recommended Products