Language
Home > Gas Turbine > Ansaldo Gasturbine
Ansaldo Energia AE64.3A
Ansaldo Energia AE64.3A
Ansaldo Energia AE64.3A
Ansaldo Energia AE64.3A

Ansaldo Energia AE64.3A

Brand:Ansaldo Gasturbine Model:Ansaldo Energia AE64.3A

Scaled down by the well-proven AE94.3A technology, the Ansaldo Energia AE64.3A offers the same high reliability in a compact package.
The rotor construction with the internally air-cooled hot gas path and the uniform temperature distribution, due to the annular combustion chamber, ensure optimum balancing of the thermal flow. This results in easy operation, fast start-up/hot restart time and high grid support capability.
Gas pre-mix combustion extension offers high flexibility throughout the operating range, with easy transient management and reliable fuel change-over.
A wide selection of fuels, ranging from low-BTU natural gas to liquid fuels, are burnt in dry pre-mix mode with no water consumption, thus minimizing both layout size and operating cost.
The compact size allows the AE64.3A turbine to be used in applications ranging from power generation to the marine industry, and make it the ideal gas burner in Energy Transition Combined-Cycle plants.
Tags:
st

Frequently Asked Questions

  • What is the typical lead time for gas turbine overhaul services?
    The lead time for gas turbine overhaul services ranges from 6 to 14 weeks, depending on the damage assessment, parts availability, and whether hot-section repairs are required. Expedited options may reduce this by 30%.
  • Do you provide customizations for legacy turbine control systems?

    Yes, we retrofit legacy systems (e.g., GE Frame 5, Siemens V94.2) with modern digital controllers, typically completing hardware integration within 4-8 weeks. Software migration requires additional validation time.

  • How often should industrial gas turbines undergo performance testing?

    We recommend annual performance testing under ISO 3977-2 standards. Critical applications (e.g., offshore platforms) may require semi-annual tests with emissions compliance checks.

  • Are your radiation-hardened (rad-hard) semiconductors compliant with MIL-PRF-38535?

    All rad-hard devices (e.g., FPGA, ADC) are QML Class V certified under MIL-PRF-38535 and tested to MIL-STD-883 Method 1019 for SEU tolerance. Full qualification reports are available upon request.

  • What temperature ranges do your military-grade ICs support?

    Our ASICs and power management ICs operate across -55°C to +175°C ambient temperatures, with derating curves provided in military temperature range (MTR) datasheets.

  • Are PMA parts interchangeable with OEM components?

    Our PMA parts (e.g., actuators, sensors) hold FAA/EASA Form 1 certification and match OEM form/fit/function. Installation requires SB/MB documentation per FAA AC 23.1529.

  • What traceability standards do you follow for aircraft fasteners?

    All NAS/MS fasteners include full DNA traceability: melt source (AMS 2301), heat/lot numbers, and AS9100-compliant MTRs with ultrasonic test reports.

  • How do you handle urgent AOG (Aircraft on Ground) requests?

    AOG orders ship within 4 hours for stocked items (FAA-PMA, EASA Part 21G). Non-stock critical parts trigger priority manufacturing with 72-hour max turnaround.

Recommended Products