Language
Home > Aircraft Parts > Aero Engine Stands
Trent 800 Sling (Transfer Beam)
Trent 800 Sling (Transfer Beam)

Trent 800 Sling (Transfer Beam)

Brand:Aero Engine Stands Model:Trent 800 Sling (Transfer Beam)

Manufacturer:NextGen
Location:AZ, FL, Miami, The Netherlands, Tolleson

Manufacturer:NextGen

Location:AZ, FL, Miami, The Netherlands, Tolleson



Getting to Know Engine StandThe NextGen Trent 800 Sling (Transfer Beam) represents a cutting-edge solution for aviation maintenance professionals handling Rolls-Royce Trent 800 engines. This specialized equipment combines robust engineering with precise functionality, making it an indispensable tool for engine transportation and maintenance operations. Designed with industry-leading specifications, it ensures secure handling while maintaining the integrity of valuable engine assets.

Features and Applications Engine StandThis versatile transfer sling system offers exceptional flexibility in engine handling operations. It seamlessly integrates with both pylon attachment plates and stand pickup points, enabling smooth transitions between different maintenance positions. The system’s bootstrapping capabilities facilitate precise engine raising and lowering operations, while its compatibility with air-ride trailers ensures safe ground transportation. Perhaps most notably, it allows for complete engine transport without requiring component removal, significantly reducing maintenance time and complexity.

Technical Specifications Engine StandThe NGT8T200 model exemplifies NextGen’s commitment to engineering excellence. Its design incorporates multiple attachment points for enhanced stability during engine transfers. The structure is optimized for compatibility with standard air-ride trailers, ensuring safe transport across maintenance facilities. This transfer beam adheres to OEM specifications for ground support equipment, guaranteeing reliability and safety in all operating conditions. The system’s robust construction supports the full weight of the Trent 800 engine while maintaining precise control during handling operations.



Frequently Asked Questions

  • What is the typical lead time for gas turbine overhaul services?
    The lead time for gas turbine overhaul services ranges from 6 to 14 weeks, depending on the damage assessment, parts availability, and whether hot-section repairs are required. Expedited options may reduce this by 30%.
  • Do you provide customizations for legacy turbine control systems?

    Yes, we retrofit legacy systems (e.g., GE Frame 5, Siemens V94.2) with modern digital controllers, typically completing hardware integration within 4-8 weeks. Software migration requires additional validation time.

  • How often should industrial gas turbines undergo performance testing?

    We recommend annual performance testing under ISO 3977-2 standards. Critical applications (e.g., offshore platforms) may require semi-annual tests with emissions compliance checks.

  • Are your radiation-hardened (rad-hard) semiconductors compliant with MIL-PRF-38535?

    All rad-hard devices (e.g., FPGA, ADC) are QML Class V certified under MIL-PRF-38535 and tested to MIL-STD-883 Method 1019 for SEU tolerance. Full qualification reports are available upon request.

  • What temperature ranges do your military-grade ICs support?

    Our ASICs and power management ICs operate across -55°C to +175°C ambient temperatures, with derating curves provided in military temperature range (MTR) datasheets.

  • Are PMA parts interchangeable with OEM components?

    Our PMA parts (e.g., actuators, sensors) hold FAA/EASA Form 1 certification and match OEM form/fit/function. Installation requires SB/MB documentation per FAA AC 23.1529.

  • What traceability standards do you follow for aircraft fasteners?

    All NAS/MS fasteners include full DNA traceability: melt source (AMS 2301), heat/lot numbers, and AS9100-compliant MTRs with ultrasonic test reports.

  • How do you handle urgent AOG (Aircraft on Ground) requests?

    AOG orders ship within 4 hours for stocked items (FAA-PMA, EASA Part 21G). Non-stock critical parts trigger priority manufacturing with 72-hour max turnaround.

Recommended Products