Language
Home > Military Semiconductors > NVIDIA
NVIDIA RTX PRO 5000 Blackwell
NVIDIA RTX PRO 5000 Blackwell

NVIDIA RTX PRO 5000 Blackwell

Brand:NVIDIA Model:NVIDIA RTX PRO 5000 Blackwell

Breakthrough Performance
Unlock next-level AI performance and neural rendering capabilities with the NVIDIA RTX PRO™ 5000 Blackwell. Built on NVIDIA Blackwell architecture and equipped with 48GB of ultra-fast GDDR7 memory, it accelerates everything from AI development, LLM inference, and generative AI workflows along with high-fidelity simulations, video production, and complex 3D modeling from your desktop. With the RTX PRO 5000, seamlessly run local AI assistants, craft photorealistic visuals with neural rendering, and optimize precision-critical simulations for engineering and scientific research, all with unmatched stability and speed.


Breakthrough Performance


Unlock next-level AI performance and neural rendering capabilities with the NVIDIA RTX PRO™ 5000 Blackwell. Built on NVIDIA Blackwell architecture and equipped with 48GB of ultra-fast GDDR7 memory, it accelerates everything from AI development, LLM inference, and generative AI workflows along with high-fidelity simulations, video production, and complex 3D modeling from your desktop. With the RTX PRO 5000, seamlessly run local AI assistants, craft photorealistic visuals with neural rendering, and optimize precision-critical simulations for engineering and scientific research, all with unmatched stability and speed.


NVIDIA Blackwell RTX PRO Comes to Workstations and Servers for Designers, Developers, Data Scientists and Creatives to Build and Collaborate With Agentic AI


Groundbreaking AI and graphics performance redefine visualization, simulation and scientific computing from desktop to data center for millions of professionals worldwide.



Features


Powered by NVIDIA Blackwell Architecture

 NVIDIA Blackwell Architecture


Fifth-Gen Tensor Cores


Max AI performance with FP4 and DLSS 4


New Streaming Multiprocessors


AI-powered graphics with neural shaders


Fourth-Gen Ray Tracing Cores


Built for RTX Mega Geometry

Frequently Asked Questions

  • What is the typical lead time for gas turbine overhaul services?
    The lead time for gas turbine overhaul services ranges from 6 to 14 weeks, depending on the damage assessment, parts availability, and whether hot-section repairs are required. Expedited options may reduce this by 30%.
  • Do you provide customizations for legacy turbine control systems?

    Yes, we retrofit legacy systems (e.g., GE Frame 5, Siemens V94.2) with modern digital controllers, typically completing hardware integration within 4-8 weeks. Software migration requires additional validation time.

  • How often should industrial gas turbines undergo performance testing?

    We recommend annual performance testing under ISO 3977-2 standards. Critical applications (e.g., offshore platforms) may require semi-annual tests with emissions compliance checks.

  • Are your radiation-hardened (rad-hard) semiconductors compliant with MIL-PRF-38535?

    All rad-hard devices (e.g., FPGA, ADC) are QML Class V certified under MIL-PRF-38535 and tested to MIL-STD-883 Method 1019 for SEU tolerance. Full qualification reports are available upon request.

  • What temperature ranges do your military-grade ICs support?

    Our ASICs and power management ICs operate across -55°C to +175°C ambient temperatures, with derating curves provided in military temperature range (MTR) datasheets.

  • Are PMA parts interchangeable with OEM components?

    Our PMA parts (e.g., actuators, sensors) hold FAA/EASA Form 1 certification and match OEM form/fit/function. Installation requires SB/MB documentation per FAA AC 23.1529.

  • What traceability standards do you follow for aircraft fasteners?

    All NAS/MS fasteners include full DNA traceability: melt source (AMS 2301), heat/lot numbers, and AS9100-compliant MTRs with ultrasonic test reports.

  • How do you handle urgent AOG (Aircraft on Ground) requests?

    AOG orders ship within 4 hours for stocked items (FAA-PMA, EASA Part 21G). Non-stock critical parts trigger priority manufacturing with 72-hour max turnaround.

Recommended Products