Language
Home > Military Semiconductors > L3HARRISFAST. FORWARD
L3HARRISFAST. FORWARD XL Converge 150P Single-Band Portable Radio
L3HARRISFAST. FORWARD XL Converge 150P Single-Band Portable Radio

L3HARRISFAST. FORWARD XL Converge 150P Single-Band Portable Radio

Brand:L3HARRISFAST. FORWARD Model:L3HARRISFAST. FORWARD XL Converge 150P Single-Band Portable Radio

Intuitive, resilient, rugged — all in one powerful device.
The single-band XL Converge 150P is the first Land Mobile Radio (LMR) in its class that comes standard with built-in LTE, Wi-Fi, Bluetooth® and GPS connectivity.

Intuitive, resilient, rugged — all in one powerful device.


The single-band XL Converge 150P is the first Land Mobile Radio (LMR) in its class that comes standard with built-in LTE, Wi-Fi, Bluetooth® and GPS connectivity.


This affordable solution delivers industry-leading audio with amplified sound, advanced noise cancellation technology and encryption, ensuring your communications will be loud, clear and secure. The XL 150P comes equipped with a full keypad for ease of use, and includes an antenna, battery, belt clip and XL Single-Bay+ charger.

RELENTLESSLY RELIABLE

XL Radios run on systems that double down on redundancy, champion open networks and connect seamlessly with all P25-compliant organizations.

POINT-TO-POINT SECURE

Our AES-256 encryption provides an end-to-end secure configuration, keeping you safe from threats.

BACKED WITH ALL-IN, 24/7 SUPPORT

Our service packages keep your radios up and running with in-field preventative maintenance and software upgrades.

Frequently Asked Questions

  • What is the typical lead time for gas turbine overhaul services?
    The lead time for gas turbine overhaul services ranges from 6 to 14 weeks, depending on the damage assessment, parts availability, and whether hot-section repairs are required. Expedited options may reduce this by 30%.
  • Do you provide customizations for legacy turbine control systems?

    Yes, we retrofit legacy systems (e.g., GE Frame 5, Siemens V94.2) with modern digital controllers, typically completing hardware integration within 4-8 weeks. Software migration requires additional validation time.

  • How often should industrial gas turbines undergo performance testing?

    We recommend annual performance testing under ISO 3977-2 standards. Critical applications (e.g., offshore platforms) may require semi-annual tests with emissions compliance checks.

  • Are your radiation-hardened (rad-hard) semiconductors compliant with MIL-PRF-38535?

    All rad-hard devices (e.g., FPGA, ADC) are QML Class V certified under MIL-PRF-38535 and tested to MIL-STD-883 Method 1019 for SEU tolerance. Full qualification reports are available upon request.

  • What temperature ranges do your military-grade ICs support?

    Our ASICs and power management ICs operate across -55°C to +175°C ambient temperatures, with derating curves provided in military temperature range (MTR) datasheets.

  • Are PMA parts interchangeable with OEM components?

    Our PMA parts (e.g., actuators, sensors) hold FAA/EASA Form 1 certification and match OEM form/fit/function. Installation requires SB/MB documentation per FAA AC 23.1529.

  • What traceability standards do you follow for aircraft fasteners?

    All NAS/MS fasteners include full DNA traceability: melt source (AMS 2301), heat/lot numbers, and AS9100-compliant MTRs with ultrasonic test reports.

  • How do you handle urgent AOG (Aircraft on Ground) requests?

    AOG orders ship within 4 hours for stocked items (FAA-PMA, EASA Part 21G). Non-stock critical parts trigger priority manufacturing with 72-hour max turnaround.

Recommended Products