Language
Home > Military Semiconductors > L3HARRISFAST. FORWARD
L3HARRISFAST. FORWARD T-740E S-Band Launch Vehicle Transmitter
L3HARRISFAST. FORWARD T-740E S-Band Launch Vehicle Transmitter

L3HARRISFAST. FORWARD T-740E S-Band Launch Vehicle Transmitter

Brand:L3HARRISFAST. FORWARD Model:L3HARRISFAST. FORWARD T-740E S-Band Launch Vehicle Transmitter

Tracking and Data Relay Satellite System (TDRSS) transmitter

Tracking and Data Relay Satellite System (TDRSS) transmitter

The T-740E Transmitter is a rugged, flight-proven Tracking and Data Relay Satellite System (TDRSS) transmitter with successful launches on multiple launch vehicles. It provides the critical connection between a launch vehicle and NASA’s TDRSS for complete telemetry coverage during ascent and staging, alleviating dependence on downrange telemetry gathering stations.

The center frequency of the T-740E transmitter can be set across the TDRSS S-band with simple tuning changes. It uses a low-phase noise temperature-compensated crystal oscillator for the frequency source. Phase noise is less than 5° RMS under vibration conditions experienced during launch. Premodulation shaping of the data is available for optimum spectral containment.

The solid-state power amplifier (SSPA) employs high-efficiency, space-qualified gallium nitride field-effect transistor power devices to generate the 40-watt RF power. Design of the SSPA minimizes compression of the shaped signals over all environments.

Frequently Asked Questions

  • What is the typical lead time for gas turbine overhaul services?
    The lead time for gas turbine overhaul services ranges from 6 to 14 weeks, depending on the damage assessment, parts availability, and whether hot-section repairs are required. Expedited options may reduce this by 30%.
  • Do you provide customizations for legacy turbine control systems?

    Yes, we retrofit legacy systems (e.g., GE Frame 5, Siemens V94.2) with modern digital controllers, typically completing hardware integration within 4-8 weeks. Software migration requires additional validation time.

  • How often should industrial gas turbines undergo performance testing?

    We recommend annual performance testing under ISO 3977-2 standards. Critical applications (e.g., offshore platforms) may require semi-annual tests with emissions compliance checks.

  • Are your radiation-hardened (rad-hard) semiconductors compliant with MIL-PRF-38535?

    All rad-hard devices (e.g., FPGA, ADC) are QML Class V certified under MIL-PRF-38535 and tested to MIL-STD-883 Method 1019 for SEU tolerance. Full qualification reports are available upon request.

  • What temperature ranges do your military-grade ICs support?

    Our ASICs and power management ICs operate across -55°C to +175°C ambient temperatures, with derating curves provided in military temperature range (MTR) datasheets.

  • Are PMA parts interchangeable with OEM components?

    Our PMA parts (e.g., actuators, sensors) hold FAA/EASA Form 1 certification and match OEM form/fit/function. Installation requires SB/MB documentation per FAA AC 23.1529.

  • What traceability standards do you follow for aircraft fasteners?

    All NAS/MS fasteners include full DNA traceability: melt source (AMS 2301), heat/lot numbers, and AS9100-compliant MTRs with ultrasonic test reports.

  • How do you handle urgent AOG (Aircraft on Ground) requests?

    AOG orders ship within 4 hours for stocked items (FAA-PMA, EASA Part 21G). Non-stock critical parts trigger priority manufacturing with 72-hour max turnaround.

Recommended Products