Language
Home > Gas Turbine > GE Gas Turbine
GE Gas Turbine Graffenstaden GEARBOX Model TX61/1CV 334A5063P001
GE Gas Turbine Graffenstaden GEARBOX Model TX61/1CV 334A5063P001

GE Gas Turbine Graffenstaden GEARBOX Model TX61/1CV 334A5063P001

Brand:GE Gas Turbine Model:GE Gas Turbine Graffenstaden GEARBOX Model TX61/1CV 334A5063P001

TWO Unused/New FLENDER GEARBOX, LM6000 PG, 50HZ,
New

Manufacture: Flender Graffenstaden
-Model # TX61/1CV
-2 Pole Generator
-Gear Rated 62755 kW / 84156 HP
-Service Factor API 613/03 > 1,1
-Rated Input Speed 3918 RPM
-Rated Output Speed 3000 RPM
-Speed Ratio 1,31

For FR6B Gas Turbine

For LM6000 PG, 50HZ

GE P/N: 334A5063P001



Each Box Size

· Length = 3.31m

· Height = 2.45m

· Width = 2.52m

· Weight = 16,120Kg
Tags:

TWO Unused/New FLENDER GEARBOX, LM6000 PG, 50HZ,

New


Manufacture: Flender Graffenstaden

-Model # TX61/1CV

-2 Pole Generator

-Gear Rated 62755 kW / 84156 HP

-Service Factor API 613/03 > 1,1

-Rated Input Speed 3918 RPM

-Rated Output Speed 3000 RPM

-Speed Ratio 1,31


For FR6B Gas Turbine


For LM6000 PG, 50HZ


GE P/N: 334A5063P001



Each Box Size


· Length = 3.31m


· Height = 2.45m


· Width = 2.52m


· Weight = 16,120Kg

Frequently Asked Questions

  • What is the typical lead time for gas turbine overhaul services?
    The lead time for gas turbine overhaul services ranges from 6 to 14 weeks, depending on the damage assessment, parts availability, and whether hot-section repairs are required. Expedited options may reduce this by 30%.
  • Do you provide customizations for legacy turbine control systems?

    Yes, we retrofit legacy systems (e.g., GE Frame 5, Siemens V94.2) with modern digital controllers, typically completing hardware integration within 4-8 weeks. Software migration requires additional validation time.

  • How often should industrial gas turbines undergo performance testing?

    We recommend annual performance testing under ISO 3977-2 standards. Critical applications (e.g., offshore platforms) may require semi-annual tests with emissions compliance checks.

  • Are your radiation-hardened (rad-hard) semiconductors compliant with MIL-PRF-38535?

    All rad-hard devices (e.g., FPGA, ADC) are QML Class V certified under MIL-PRF-38535 and tested to MIL-STD-883 Method 1019 for SEU tolerance. Full qualification reports are available upon request.

  • What temperature ranges do your military-grade ICs support?

    Our ASICs and power management ICs operate across -55°C to +175°C ambient temperatures, with derating curves provided in military temperature range (MTR) datasheets.

  • Are PMA parts interchangeable with OEM components?

    Our PMA parts (e.g., actuators, sensors) hold FAA/EASA Form 1 certification and match OEM form/fit/function. Installation requires SB/MB documentation per FAA AC 23.1529.

  • What traceability standards do you follow for aircraft fasteners?

    All NAS/MS fasteners include full DNA traceability: melt source (AMS 2301), heat/lot numbers, and AS9100-compliant MTRs with ultrasonic test reports.

  • How do you handle urgent AOG (Aircraft on Ground) requests?

    AOG orders ship within 4 hours for stocked items (FAA-PMA, EASA Part 21G). Non-stock critical parts trigger priority manufacturing with 72-hour max turnaround.

Recommended Products