Language
Home > Gas Turbine > GE Gas Turbine
GE Gas Turbine General Electric / MS9001E / PG9151E Complete GT (3 Units)
GE Gas Turbine General Electric / MS9001E / PG9151E Complete GT (3 Units)

GE Gas Turbine General Electric / MS9001E / PG9151E Complete GT (3 Units)

Brand:GE Gas Turbine Model:GE Gas Turbine General Electric / MS9001E / PG9151E Complete GT (3 Units)

General Electric / MS9001E / PG9151E Complete GT

Model: 1986

GT and Compressor, Rotors

Atomizing System, Combustion System, IGV, Jacking Oil System, Hydraulic Oil System.

CO2 System for Fire Protection

Startup motor & system

GT compartment heating and ventalition system.

LCR

HMI and CPU Speedtronic Mark-Vie

(Except Transformer, Filter Unit, Cooling System, Chimney, Exhaust System).

Rated Output: 84.6 MW

Guaranteed Output: 81 MW demonstrated at DCC test in 2021



3 Unit Available

GT-1 : 171,323.96 GFH - Total Start 3704 - Last Maintenance: MI - Nov 2019
GT-2 : 166,897.87 GFH - Total Start 3575 - Last Maintenance: HGPI - Nov 2017
GT-3 : 163,005.73 GFH - Total Start 3634 - Last Maintenance: Nov- 2018
TPI SOW: Manpower, Dismantling & Lifting Operations (Ex-Works)
Tags:

General Electric / MS9001E / PG9151E Complete GT


Model: 1986


GT and Compressor, Rotors


Atomizing System, Combustion System, IGV, Jacking Oil System, Hydraulic Oil System.


CO2 System for Fire Protection


Startup motor & system


GT compartment heating and ventalition system.


LCR


HMI and CPU Speedtronic Mark-Vie


(Except Transformer, Filter Unit, Cooling System, Chimney, Exhaust System).


Rated Output: 84.6 MW


Guaranteed Output: 81 MW demonstrated at DCC test in 2021



3 Unit Available


GT-1 : 171,323.96 GFH - Total Start 3704 - Last Maintenance: MI - Nov 2019

GT-2 : 166,897.87 GFH - Total Start 3575 - Last Maintenance: HGPI - Nov 2017

GT-3 : 163,005.73 GFH - Total Start 3634 - Last Maintenance: Nov- 2018

TPI SOW: Manpower, Dismantling & Lifting Operations (Ex-Works)

Frequently Asked Questions

  • What is the typical lead time for gas turbine overhaul services?
    The lead time for gas turbine overhaul services ranges from 6 to 14 weeks, depending on the damage assessment, parts availability, and whether hot-section repairs are required. Expedited options may reduce this by 30%.
  • Do you provide customizations for legacy turbine control systems?

    Yes, we retrofit legacy systems (e.g., GE Frame 5, Siemens V94.2) with modern digital controllers, typically completing hardware integration within 4-8 weeks. Software migration requires additional validation time.

  • How often should industrial gas turbines undergo performance testing?

    We recommend annual performance testing under ISO 3977-2 standards. Critical applications (e.g., offshore platforms) may require semi-annual tests with emissions compliance checks.

  • Are your radiation-hardened (rad-hard) semiconductors compliant with MIL-PRF-38535?

    All rad-hard devices (e.g., FPGA, ADC) are QML Class V certified under MIL-PRF-38535 and tested to MIL-STD-883 Method 1019 for SEU tolerance. Full qualification reports are available upon request.

  • What temperature ranges do your military-grade ICs support?

    Our ASICs and power management ICs operate across -55°C to +175°C ambient temperatures, with derating curves provided in military temperature range (MTR) datasheets.

  • Are PMA parts interchangeable with OEM components?

    Our PMA parts (e.g., actuators, sensors) hold FAA/EASA Form 1 certification and match OEM form/fit/function. Installation requires SB/MB documentation per FAA AC 23.1529.

  • What traceability standards do you follow for aircraft fasteners?

    All NAS/MS fasteners include full DNA traceability: melt source (AMS 2301), heat/lot numbers, and AS9100-compliant MTRs with ultrasonic test reports.

  • How do you handle urgent AOG (Aircraft on Ground) requests?

    AOG orders ship within 4 hours for stocked items (FAA-PMA, EASA Part 21G). Non-stock critical parts trigger priority manufacturing with 72-hour max turnaround.

Recommended Products