GE GAS TURBINE FRAME 6 PG6581(B)
Frame 6
Heavy Duty 38.5 MW
Gas Turbine Compartment
Gas Turbine Generator Compartment
Air Inlet System
Gas Turbine Control System (MK V)
On base/Off base equipment
Gas Turbine 1A 1 General Electric PG 6581 (B) 42,100 kW
Gas Turbine Generator 1A 1 ALSTOM T214-234 -
Control Cabinet 1 -
GT Control System 1 General Electric MK V -
Unit Auxiliary Transformer 1 1 Fuji Electric 400 kVA - 11 kV/400V -
Inlet Filter House 1
Gas Fuel Control Skid 1
Compressor washing Skid 1
Fire Protection and CO2 Skid 1
Exhaust Plenum and Damper 1
Maker GE Energy Products Germany
GmbH
Load Type Generator
Fuel Type Natural Gas (NG)
Rated Output (MW) 42 MW
Rated Speed (rpm) 5100
Control system EMERSON/OVATION,
GE/Mark V
Acc. Gear/ Type BHS/A619
Load Gear/ Type Flender/TRL65CV
Generator/ Type ALSTOM/T190-240
Generator speed (rpm) 1,500
Technical Specification
EOH (Hrs.) 171,772
Yes, we retrofit legacy systems (e.g., GE Frame 5, Siemens V94.2) with modern digital controllers, typically completing hardware integration within 4-8 weeks. Software migration requires additional validation time.
We recommend annual performance testing under ISO 3977-2 standards. Critical applications (e.g., offshore platforms) may require semi-annual tests with emissions compliance checks.
All rad-hard devices (e.g., FPGA, ADC) are QML Class V certified under MIL-PRF-38535 and tested to MIL-STD-883 Method 1019 for SEU tolerance. Full qualification reports are available upon request.
Our ASICs and power management ICs operate across -55°C to +175°C ambient temperatures, with derating curves provided in military temperature range (MTR) datasheets.
Our PMA parts (e.g., actuators, sensors) hold FAA/EASA Form 1 certification and match OEM form/fit/function. Installation requires SB/MB documentation per FAA AC 23.1529.
All NAS/MS fasteners include full DNA traceability: melt source (AMS 2301), heat/lot numbers, and AS9100-compliant MTRs with ultrasonic test reports.
AOG orders ship within 4 hours for stocked items (FAA-PMA, EASA Part 21G). Non-stock critical parts trigger priority manufacturing with 72-hour max turnaround.