Language
Home > Gas Turbine > GE Gas Turbine
GE GAS TURBINE FRAME 6 PG6581(B)
GE GAS TURBINE FRAME 6 PG6581(B)
GE GAS TURBINE FRAME 6 PG6581(B)
GE GAS TURBINE FRAME 6 PG6581(B)

GE GAS TURBINE FRAME 6 PG6581(B)

Brand:GE Gas Turbine Model:GE GAS TURBINE FRAME 6 PG6581(B)

GE GAS TURBINE FRAME 6 PG6581(B)

Frame 6
Heavy Duty 38.5 MW
Tags:

GE GAS TURBINE FRAME 6 PG6581(B)


Frame 6

Heavy Duty 38.5 MW

Gas Turbine Compartment

Gas Turbine Generator Compartment

Air Inlet System

Gas Turbine Control System (MK V)

On base/Off base equipment

Gas Turbine 1A 1 General Electric PG 6581 (B) 42,100 kW


Gas Turbine Generator 1A 1 ALSTOM T214-234 -

Control Cabinet 1 -

GT Control System 1 General Electric MK V -

Unit Auxiliary Transformer 1 1 Fuji Electric 400 kVA - 11 kV/400V -

Inlet Filter House 1

Gas Fuel Control Skid 1

Compressor washing Skid 1

Fire Protection and CO2 Skid 1

Exhaust Plenum and Damper 1

Maker GE Energy Products Germany

GmbH

Load Type Generator

Fuel Type Natural Gas (NG)

Rated Output (MW) 42 MW

Rated Speed (rpm) 5100

Control system EMERSON/OVATION,

GE/Mark V

Acc. Gear/ Type BHS/A619

Load Gear/ Type Flender/TRL65CV

Generator/ Type ALSTOM/T190-240

Generator speed (rpm) 1,500

Technical Specification

EOH (Hrs.) 171,772

Frequently Asked Questions

  • What is the typical lead time for gas turbine overhaul services?
    The lead time for gas turbine overhaul services ranges from 6 to 14 weeks, depending on the damage assessment, parts availability, and whether hot-section repairs are required. Expedited options may reduce this by 30%.
  • Do you provide customizations for legacy turbine control systems?

    Yes, we retrofit legacy systems (e.g., GE Frame 5, Siemens V94.2) with modern digital controllers, typically completing hardware integration within 4-8 weeks. Software migration requires additional validation time.

  • How often should industrial gas turbines undergo performance testing?

    We recommend annual performance testing under ISO 3977-2 standards. Critical applications (e.g., offshore platforms) may require semi-annual tests with emissions compliance checks.

  • Are your radiation-hardened (rad-hard) semiconductors compliant with MIL-PRF-38535?

    All rad-hard devices (e.g., FPGA, ADC) are QML Class V certified under MIL-PRF-38535 and tested to MIL-STD-883 Method 1019 for SEU tolerance. Full qualification reports are available upon request.

  • What temperature ranges do your military-grade ICs support?

    Our ASICs and power management ICs operate across -55°C to +175°C ambient temperatures, with derating curves provided in military temperature range (MTR) datasheets.

  • Are PMA parts interchangeable with OEM components?

    Our PMA parts (e.g., actuators, sensors) hold FAA/EASA Form 1 certification and match OEM form/fit/function. Installation requires SB/MB documentation per FAA AC 23.1529.

  • What traceability standards do you follow for aircraft fasteners?

    All NAS/MS fasteners include full DNA traceability: melt source (AMS 2301), heat/lot numbers, and AS9100-compliant MTRs with ultrasonic test reports.

  • How do you handle urgent AOG (Aircraft on Ground) requests?

    AOG orders ship within 4 hours for stocked items (FAA-PMA, EASA Part 21G). Non-stock critical parts trigger priority manufacturing with 72-hour max turnaround.

Recommended Products