Language
Home > Gas Turbine > GE Gas Turbine
Gas Turbine Rotor components
Gas Turbine Rotor components

Gas Turbine Rotor components

Brand:GE Gas Turbine Model:Gas Turbine Rotor components

HGTP is a premier worldwide supplier of heavy-frame Gas Turbine Rotor components. As your fleet approaches rotor end of life, inquire about HGTP’s replacement turbine wheels, disks and spacers.

Design and Manufacture of Replacement Rotor Components

Configuration based on full reverse engineering of zero fired hours OEM

hgtp stocks compressor rotor blading, blade spacers, and rotor bolting hardware

Engineered solutions that provide more robust, upgraded components

HGTP has the depth of knowledge on materials, coatings, and manufacturing technologies to support your Gas Turbine replacement parts requirements. Serving multiple OEMs, Frame Sizes, and Technologies, HGTP also provides buckets, nozzles, shrouds and the associated installation hardware
Tags:

HGTP is a premier worldwide supplier of heavy-frame Gas Turbine Rotor components. As your fleet approaches rotor end of life, inquire about HGTP’s replacement turbine wheels, disks and spacers.

Design and Manufacture of Replacement Rotor Components

HGTP has the depth of knowledge on materials, coatings, and manufacturing technologies to support your Gas Turbine replacement parts requirements. Serving multiple OEMs, Frame Sizes, and Technologies, HGTP also provides buckets, nozzles, shrouds and the associated installation hardware

Frequently Asked Questions

  • What is the typical lead time for gas turbine overhaul services?
    The lead time for gas turbine overhaul services ranges from 6 to 14 weeks, depending on the damage assessment, parts availability, and whether hot-section repairs are required. Expedited options may reduce this by 30%.
  • Do you provide customizations for legacy turbine control systems?

    Yes, we retrofit legacy systems (e.g., GE Frame 5, Siemens V94.2) with modern digital controllers, typically completing hardware integration within 4-8 weeks. Software migration requires additional validation time.

  • How often should industrial gas turbines undergo performance testing?

    We recommend annual performance testing under ISO 3977-2 standards. Critical applications (e.g., offshore platforms) may require semi-annual tests with emissions compliance checks.

  • Are your radiation-hardened (rad-hard) semiconductors compliant with MIL-PRF-38535?

    All rad-hard devices (e.g., FPGA, ADC) are QML Class V certified under MIL-PRF-38535 and tested to MIL-STD-883 Method 1019 for SEU tolerance. Full qualification reports are available upon request.

  • What temperature ranges do your military-grade ICs support?

    Our ASICs and power management ICs operate across -55°C to +175°C ambient temperatures, with derating curves provided in military temperature range (MTR) datasheets.

  • Are PMA parts interchangeable with OEM components?

    Our PMA parts (e.g., actuators, sensors) hold FAA/EASA Form 1 certification and match OEM form/fit/function. Installation requires SB/MB documentation per FAA AC 23.1529.

  • What traceability standards do you follow for aircraft fasteners?

    All NAS/MS fasteners include full DNA traceability: melt source (AMS 2301), heat/lot numbers, and AS9100-compliant MTRs with ultrasonic test reports.

  • How do you handle urgent AOG (Aircraft on Ground) requests?

    AOG orders ship within 4 hours for stocked items (FAA-PMA, EASA Part 21G). Non-stock critical parts trigger priority manufacturing with 72-hour max turnaround.

Recommended Products